Srinagar Vande Bharat Express receives good public response, booking full for next 10 days: Railway Authority

0
185

DH NEWS SERVICE
JAMMU, JUNE 11
The Vande Bharat Express operating on the newly launched Katra-Srinagar route is witnessing overwhelming demand from passengers, with bookings full for the next 10 days, according to railway authorities.
Station Superintendent at Mata Vaishno Devi Katra Railway Station, Jugal Kishor Sharma, said the response to the train has far exceeded expectations.”We are receiving a very good response from the public for the Vande Bharat Express, which was inaugurated by Prime Minister Narendra Modi. People are very excited, and there are no seats available for the next 10 days,” Sharma said.
Sharma attributed the strong enthusiasm to the train’s state-of-the-art facilities and the significance of the route, which connects important religious and tourist destinations.”It’s a new route, and there is great enthusiasm among the public to travel on it — that’s why there’s a long waiting list for seats,” he added.
He also assured that railway staff are working diligently to ensure a smooth travel experience. “We are making sure that there are no discomfort or complaints from the passengers. The railway staff is also making all necessary efforts to facilitate the passengers,” Sharma said.
The train, which is part of the Indian Railways’ push for faster and more comfortable travel options, aims to boost connectivity in Jammu and Kashmir, particularly for pilgrims visiting the revered Mata Vaishno Devi shrine in Katra and tourists headed to the Kashmir Valley. The Vande Bharat Express has been equipped with modern features, including faster acceleration, comfortable seating, and enhanced safety protocols, further contributing to its popularity among passengers.
Notably, the bridge on the River Chenab, being the highest bridge in the world, is a milestone project for the Indian Railways, which was completed after several ups and downs in a difficult terrain. It connects Kashmir to Jammu and the entire country via rail. The two Vande Bharat Express trains from Katra Railway Station, directly connecting the Jammu division with Kashmir, were flagged off by Prime Minister Narendra Modi on June 6.
The new Vande Bharat Express train will take just about three hours to travel between Katra and Srinagar, reducing the existing travel time by two to three hours. These trains have been specially designed to operate in the cold climatic conditions of the Kashmir Valley. The train will run through the Anji Khad Bridge, which is India’s first cable-stayed railway bridge, and the Chenab Bridge, which is the highest railway arch bridge in the world.The USBRL project is 272 kilometres long, constructed worth around Rs 43,780 crore, includes 36 tunnels (spanning 119 km) and 943 bridges.
The project establishes all-weather, seamless rail connectivity between the Kashmir Valley and the rest of the country, aiming to transform regional mobility and drive socio-economic integration.

LEAVE A REPLY

Please enter your comment!
Please enter your name here